Case Studies

Case Study

QGP Stage 2 Expansion Project

QLD (2014) 16″ 35km, X70, Dual Layer FBE, 12 750kPa

Read more
Case Study

Eastern Goldfields Project

WA (2015) 8″ 294km, X42, Dual Layer FBE, 12 750kPa The hydrotesting for this project was broken into 3 sections being 83km, 120km & 91km. The second test section required 12 temperature probes at 10km points. We believe this is the longest pipeline to be tested to AS2885.5 in Australian history.

Read more
Case Study

Victorian Northern Interconnect Expansion

Phase 3, NSW & VIC (2016) 16″ 55km, X70, FBE, 12,750kPa & 18″ 38km, X70, FBE, 12,750kPa

Read more
Case Study

Scotia Interconnect, QLD, 2017

12″, 14km, X70,FBE, 19450kPa

Read more
Case Study

QCLNG – QLD – 2018

Engineering support with Test Pack Preparation, various hydrostatic and pneumatic testing, flange management and pressure test reporting.

Read more